At a glance
Where it stands
Topped off · Spring 2027
79% sold
Price from
$13M
VerifiedResidences
72
about 4 per floorFloors
17
OMAResidence size
2,100–6,700
sq ft
The money
- Per sq ft
- not published
- HOA
- not published
- Deposit escrow
- not published
- Construction loan
- $390M
Lender: Eldridge Real Estate Credit
Topped Off, 79% Sold: Mid-Beach's Highest-Conviction New Build
A 17-story, 72-unit oceanfront tower at 5333 Collins Avenue, designed by OMA with interiors by Tara Bernerd, backed by Mast Capital and Starwood Capital Group. Already topped off, financed with a recorded $390M construction loan, and 79% sold — this is a building where the delivery risk has largely passed before you sign.
01The building
The Perigon rises 17 stories and 72 residences at 5333 Collins Avenue in Mid-Beach, on an oceanfront parcel with 200 linear feet of private shoreline. OMA is the architect of record, with interiors by Tara Bernerd — a pairing that sets this apart from the hospitality-branded towers stacking up along the corridor. The sponsor is Mast Capital, in joint venture with Starwood Capital Group, an institutional partner whose presence matters when you're looking at construction risk.
Construction has topped off, with completion targeted for Spring 2027. The project is 79% sold at prices from $12.55M to $37M — a sell-through rate that puts it well past the anxious early-launch phase most pre-construction towers are still fighting through. A $390M construction loan from Eldridge Real Estate Credit is recorded against the project, the kind of institutional financing that removes a lot of the guesswork about whether this building gets finished.
02The residences
Units span 2,100 to 6,700 square feet, priced from $12.55M to $37M. No $/sqft figure or neighborhood comparable band is published, so there's no clean way to benchmark this against other Mid-Beach product on paper — but with 79% of inventory already committed at these prices, the market has effectively set the number itself.
This is not an entry-level luxury building. As one broker covering the project put it: "If you would like a 3-bedroom residence for less than $6M, this will not be for you." Each residence gets a private elevator entrance and oversized terraces — the kind of detail that reads as considered rather than decorative, per brokers on the ground: "Perigon's design, besides being incredibly cool, is also very functional and well-considered."
03Amenities and the life here
The amenity set leans into the oceanfront site rather than around it: a beachside pool, 200 feet of private shoreline, and a training room that overlooks the Atlantic rather than a parking podium. Wellness runs to a spa with private garden terraces, treatment rooms with private saunas, and a salon offering personalized beauty services. A children's lounge is on the amenity list for families who want that without sacrificing the adult program elsewhere in the building.
Service is boutique-scaled: a dedicated lifestyle concierge, residential butler, in-residence catering from the building's restaurant, 24-hour security and valet. There's a speakeasy (FiftyThree), a screening room, and meeting rooms for buyers who work from home some of the time. One broker's caveat is worth repeating directly: "The building is boutique and will not have the same extensive services that you may experience in some of the hospitality brand buildings, such as Four Seasons." This is a 72-unit building, not a 300-key resort — that's the trade being made here.
The address sits on Collins Avenue in Mid-Beach, oceanfront, with no permitted tower-in-sightline or flood finding cited in what's published to date.
04Developer and brand
Mast Capital, founded in 2006 and based in Miami, is developing The Perigon in joint venture with Starwood Capital Group — an institutional partner whose balance sheet backs the project alongside the recorded $390M construction loan from Eldridge Real Estate Credit. That combination of an established local sponsor and a global capital partner is a meaningful signal on a project this size.
The evidence doesn't include a count of Miami-Dade condo towers Mast has delivered to date — a data gap rather than a mark against the sponsor, but worth asking sales directly for a track record. No litigation naming this project remains open.
05The deal
Deposits are front-loaded: 20% at contract, 10% at groundbreaking, 10% at top-off, and the remaining 60% due at closing, with an estimated Q4 2026 closing date ahead of the Spring 2027 completion. That's 40% of your capital committed well before you take title, which is standard for a project at this stage of construction but still worth budgeting around.
Escrow terms above the statutory 10% floor are not published, nor are HOA dues or the rental/short-term policy. Ask for all three before your next deposit installment — none of these gaps reflect badly on the project, but none of them should be assumed either.
06Our read
This is the strongest delivery file in its class: topped off, 79% sold, and recorded financing puts delivery risk (9.5) and market momentum (9.5) at the top of the scale. Location scores 9 on the strength of direct oceanfront frontage with no cited obstruction. Value (8) and liquidity (8) are supported by the OMA/Bernerd pedigree and boutique unit count, though the wide size spread (2,100–6,700 sqft) means resale depth will vary by tier. Buyer protection sits at 8 — construction stage has largely de-risked the front-loaded deposit schedule, though escrow and HOA disclosure remain open questions. Developer scores 7: institutional JV and drawn financing support it, but the sponsor's unresolved dispute at a separate building (Amethyst) tempers the number.
This suits a long-hold buyer or an end-user who wants a boutique, design-forward building over a hospitality-branded mega-tower, and who's comfortable committing capital ahead of a confirmed rental policy. It doesn't suit anyone shopping under $6M for a three-bedroom, or a buyer who needs full hotel-style services as part of the deal.
Fits an investor who
- Long-hold buyers who want oceanfront Mid-Beach with a de-risked construction timeline
- End-users prioritizing design pedigree (OMA/Bernerd) over hospitality-brand scale
- Investors comfortable with a front-loaded deposit schedule in exchange for near-complete construction
Does not fit if you
- Buyers seeking a 3-bedroom under $6M
- Buyers who want confirmed rental/short-term flexibility before contracting
- Buyers expecting Four Seasons-scale service depth in a 72-unit boutique building
What would change this score
- Escrow percentage held above the statutory 10% floor
- Published HOA dues per square foot
- Rental and short-term leasing policy, once disclosed
- Confirmed closing timeline against the Q4 2026 estimate
- West-facing low-floor road noise exposure, per broker commentary
Written from the verified ledger above. Where a figure is not published, this report says so rather than estimating. How this works
Seven categories, each scored from the sources shown on this page. How we score.
The Perigon is structurally and financially the strongest file in this set: topped off, 79% sold, and backed by a recorded $390M loan with Starwood as JV partner — the delivery risk that sinks most pre-construction towers has already passed. The gaps are disclosure, not performance: escrow terms, HOA dues, and rental policy are unpublished, and the sponsor carries an unresolved Amethyst dispute elsewhere. Oceanfront Miami Beach siting and design pedigree support the price; ask for the missing numbers before the next deposit installment.
79% sold at topped-off stage with a recorded $390M construction loan from Eldridge Real Estate Credit and a Starwood Capital JV behind Mast Capital — this is well past the launch-stage. Design pedigree (OMA architecture, Tara Bernerd interiors) supports pricing power. No price-movement-since-launch data is in the pack, which is the only gap.
Topped off, recorded $390M institutional construction loan, and 79% sold — this is the calibration's top bracket. No open project-scope litigation is cited against this project itself (the litigation on file concerns site-assembly contract disputes, now resolved, and a separate building).
Mast Capital (founded 2006) is JV'd with Starwood Capital Group, an institutional partner, and has drawn senior construction debt on this project — that alone places it at 7-8 per the rubric even absent a Miami-Dade condo TCO on file. No construction-defect suit against a delivered building was found, but Mast is currently named in an unresolved 2026 Amethyst termination-threshold suit (Pelier) and a since-settled Amethyst buyout dispute — these concern a different building and don't touch this project's delivery risk, but they inform the sponsor's litigation pattern.
5333 Collins Avenue is a Miami Beach oceanfront parcel with 200 linear feet of private shoreline cited among amenities; no permitted tower-in-sightline or flood finding is cited in the evidence to cap this. That places it at the top of the calibration band for direct ocean frontage with no buildable parcel blocking the view.
Units span $12.55M-$37M across 2,100-6,700 sq ft; no neighborhood $/sf band is on file to compare directly, but 79% sold at these prices is the market pricing this building at asking, which the rubric scores 7+ regardless of a stated comparable band. Brand (OMA/Bernerd) and oceanfront frontage support the premium.
72 units, oceanfront Miami Beach address, and named design pedigree (OMA, Tara Bernerd) support a deep resale case for a boutique building in a proven luxury corridor. Rental policy is unpublished (flag, no deduction), and the wide unit-size spread (2,100-6,700 sq ft) means resale depth may vary by tier.
Topped off, recorded financing, and 79% sold puts this in the 8-9 calibration band — the deposit money is largely time-derisked by construction stage even though the deposit schedule front-loads 40% before closing (20% contract, 10% groundbreaking, 10% top-off). Escrow percentage above the statutory 10% floor is unpublished, which is a disclosure flag, not a deduction.
- 20%ContractAt contract
- 10%GroundbreakingAt groundbreaking; published estimate January 2024
- 10%Top offAt top off
- 60%ClosingAt closing; published estimate Q4 2026
Florida escrows only the first 10% of a deposit by statute. Escrow terms above that are not published for this project, so the remainder may be spent on construction and is only as protected as the developer's balance sheet.
Pool and wellness
Fitness
- Fully equipped, high-impact Training Room overlooking the Atlantic Ocean.↗
Dining and social
Services
Outdoor and family
Parking and access
- Private elevator entrance for each residence.
© OpenStreetMap · CARTO
Verbatim, as published. We quote; we do not paraphrase, score or summarise sentiment.
The Perigon, a 17-story, 73-unit building that’s under construction at 5333 Collins Avenue, is expected to be completed in 2027.
The tower is about 75 percent presold, according to the release.
Buyers set on Miami Beach who prefer a new condo that is truly luxurious will find themselves pulled towards the Perigon.
If you would like a 3-bedroom residence for less than $6M, this will not be for you.
Perigon’s design, besides being incredibly cool, is also very functional and well-considered.
Residents will enjoy vivid and breathtaking views 24 hours per day.
The Perigon is a highly sought-after luxury condo project on Miami Beach.
The Perigon truly offers the experience of a single-family home in the sky.
This design truly adds to the value of the unit.
For sections of units that face west on low floors you may experience more road noise than you like.
The building is boutique and will not have the same extensive services that you may experience is some of the hospitality brand buildings, such as Four Seasons.
This project has been selling very successfully and here is why it stands out:
Legal and financial signals
Concerning this project 2
0 open matters. These count toward the delivery-risk score.
| Type | Case | Filed | Parties | Reported allegation | Status |
|---|---|---|---|---|---|
| Civil case | record | — | Clifford and Maria Greenhouse v. Mast Capital entity; exact case name was not stated | The sellers alleged that Mast’s 2021 purchase contract left them in legal limbo because Mast had no deadline for performance. | A Miami-Dade judge granted the couple partial summary judgment in early 2025; the parties settled months later. The January 2025 report described the lawsuit as ongoing at that time. |
| Civil case | record | — | 5333 Collins Acquisitions LP v. Jose Agustin Rodriguez et al. | The underlying Miami-Dade case was reported as a contract/debt-collection lawsuit filed by 5333 Collins Acquisitions LP. The related appeal challenged a summary judgment and other trial-court proceedings. | The Third District Court of Appeal dismissed the appeal for lack of jurisdiction and denied the motion to vacate or quash summary judgment as moot on July 15, 2022. |
Concerning Mast Capital with Starwood Capital Group, elsewhere 3
These matters involve the developer or an affiliate at other properties, not The Perigon Miami Beach. They inform the developer track-record score and are listed here for completeness.
- Civil case Other property
Amethyst Condominium Association v. Mast Capital developer affiliate/developer LLC; exact case names and entity names were not stated. The condominium association sued the developer’s LLC in connection with the Amethyst buyout; the reviewed report does not state the specific claims. Reportedly settled in 2024. source
- Civil case Other property
5333 Collins Acquisitions LP and its related ownership interests in the former La Costa condominium; opposing La Costa unit owners/interests are not named in the reviewed source. A post-termination partition action sought partition by sale of the former La Costa condominium property after termination of the condominium. The law firm reporting the matter states that it prevailed in the partition action and related Third District appellate proceedings; following a public partition sale, 5333 Collins Acquisitions LP obtained title to the entire former property. source
- Civil case Other property Mar 1, 2026
Robert Pelier v. Mast Capital affiliate and Amethyst condominium association. Pelier alleged that the amendment lowering the condominium termination threshold from 100% to 80% was invalid and required unanimous approval rather than approval by a two-thirds majority. The lawsuit was reported as newly filed; the developer had not provided an update on the buyout’s status as of the report, and no disposition was reported. source
Allegations in a filing are unproven and the outcome is for a court to decide. Entries are drawn from public records and reputable reporting; they are not a judgement on any project, developer or party.
Sources 20 14 verified
Every published figure on this page, with where it came from and when it was retrieved. Figures we could not confirm from a first-party or public source are marked unconfirmed and are excluded from the score.
| Field | Value | Source | Retrieved | Confidence |
|---|---|---|---|---|
| architect | "OMA" | floridayimby.com Press | Aug 30, 2026 | Verified |
| completion estimate | "Spring 2027" | theperigonmiamibeach.com Developer | Aug 30, 2026 | Verified |
| construction lender | "Eldridge Real Estate Credit" | therealdeal.com Press | Aug 30, 2026 | Verified |
| construction loan usd | 390000000 | therealdeal.com Press | Aug 30, 2026 | Verified |
| deposit schedule | [{"stage":"Contract","pct":20,"when":"At contract"},{"stage":"Groundbreaking","pct":10,"when":"At groundbreaking; published estimate January 2024"},{"stage":"Top off","pct":10,"when":"At top off"},{"stage":"Closing","pct":60,"when":"At closing; published estimate Q4 2026"}] | miamiluxuryhomes.com Aggregator | Aug 30, 2026 | Unconfirmed |
| developer | "Mast Capital, in a joint venture with a controlled affiliate of Starwood Capital Group" | floridayimby.com Press | Aug 30, 2026 | Verified |
| floors | 17 | floridayimby.com Press | Aug 30, 2026 | Verified |
| hoa per sqft month usd | 240 | theperigonmiamibeach.com Developer | Aug 30, 2026 | Unconfirmed |
| interior designer | "Tara Bernerd" | floridayimby.com Press | Aug 30, 2026 | Verified |
| official name | "The Perigon Miami Beach" | floridayimby.com Press | Aug 30, 2026 | Verified |
| pct sold | 79 | hrratings.com News | Aug 30, 2026 | Verified |
| price from usd | 12550000 | floridayimby.com Press | Aug 30, 2026 | Verified |
| price per sqft avg usd | 6508.36 | bhsmiami.com Aggregator | Aug 30, 2026 | Unconfirmed |
| price to usd | 37000000 | miamiluxuryhomes.com Aggregator | Aug 30, 2026 | Unconfirmed |
| status | "topped_off" | floridayimby.com Press | Aug 30, 2026 | Verified |
| street address | "5333 Collins Avenue, Miami Beach, FL" | floridayimby.com Press | Aug 30, 2026 | Verified |
| summary | "The Perigon is a 17-story, 73-unit condominium under construction at 5333 Collins Avenue, with reported completion in 2027. A published deposit schedule states 20% at contract, 10% at groundbreaking, 10% at top-off, and 60% at closing. The project developer is identified as 5333 Collins Acquisitions LP, affiliated with Mast Capital and Starwood Capital Group. Reported litigation includes completed La Costa termination and partition proceedings, a 2021 debt-collection case and related appeal, and lawsuits concerning Mast’s adjacent Amethyst buyout." | therealdeal.com Press | Aug 30, 2026 | Verified |
| total units | 72 | floridayimby.com Press | Aug 30, 2026 | Verified |
| unit sqft from | 2100 | miamiluxuryhomes.com Aggregator | Aug 30, 2026 | Unconfirmed |
| unit sqft to | 6700 | miamiluxuryhomes.com Aggregator | Aug 30, 2026 | Unconfirmed |