ES

Pre-construction — Brickell — Fortune International Group

ORA by Casa Tua

1210 Brickell Avenue, Miami, FL

5.0 /10
Provisional 11 of 25 inputs verified
Residences540
Floors77
Completion2030
Sources 17

Researched 3 h ago

At a glance

Where it stands

Pre-construction · 2030

Developer7.5
Carrying cost6.0

Price from

Residences

540

about 7 per floor

Floors

77

Arquitectonica

Residence size

487–2,302

sq ft

The money

Per sq ft
not published
HOA
not published
Deposit escrow
not published
Construction loan
$36M

Lender: Amerant Bank — the cited source identifies its financing as a $36,080,000 pre-development loan, not expressly as a construction loan

Amenities

34

documented, each with a source

See them all →
The reportORA by Casa Tua1189words

77 floors, 540 units, and almost no numbers on the table

ORA by Casa Tua is a preconstruction tower planned for 1210 Brickell Avenue, designed by Arquitectonica, financed so far by a $36 million loan from Amerant Bank. Price, escrow terms, HOA dues, and even the developer's corporate name are not published in the data available. That absence is the story as much as the building is.

01The rundown

ORA by Casa Tua is proposed for 1210 Brickell Avenue in Miami, at 77 floors and 540 units, with a stated completion year of 2030. It is in preconstruction — no groundbreaking has occurred according to the status field. Arquitectonica is the architect of record and m2atelier is the interior designer, both named directly in the evidence.

Unit sizes span 487 to 2,302 square feet, a range wide enough to cover a studio and a large three- or four-bedroom layout, though the evidence gives no breakdown of how many units fall at each end.

The project's developer is not named in the structured data supplied to us. That is worth sitting with before anything else: at this stage of underwriting, we would expect the sponsoring entity to be a matter of public record, and here it is simply absent from what we were given.

Financing to date consists of a $36,080,000 loan from Amerant Bank. The source evidence describes this specifically as a pre-development loan, not expressly as construction financing — a distinction that matters, since pre-development money typically covers land, design, and entitlement costs, not the vertical build itself.

02What you are buying

No price has been published — not a starting price, not a ceiling, not a price-per-square-foot figure. We cannot tell you what a unit here costs, and any number you hear elsewhere should be treated as unverified until it appears in a disclosed source.

What is published is the deposit schedule: 20% at contract signing, 10% at groundbreaking, 10% at top-off, and the remaining 60% described as due upon delivery. That is a back-loaded schedule by Miami standards — most of your capital is exposed for the entire construction period, then due in a lump sum at closing.

No HOA or monthly association fee is published. No amenities list was supplied. No rental policy — including whether short-term rental will be permitted — is in the evidence. If any of these matter to your decision, you are currently buying without them.

03The developer

The project record does not name a developer. Separately, the legal records supplied are tagged with scope "developer" and involve Fortune International Group, Fortune International Realty, Fortune International Hospitality, and Edgardo A. DeFortuna — but neither of those litigation entries concerns ORA. One involves a lender's claim over the Jade Ocean condominium project, alleging $1.5 million owed and improper direction of funds to affiliates; Fortune denied the allegations, and no final disposition is stated in the evidence. The other involves the M Resort Residences condominium association disputing whether unit owners held fee-simple interests, at a project marketed as a condo-hotel; a 2011 appellate ruling quashed certain fee-payment orders without resolving the underlying case.

We flag both because they are what the evidence contains under "developer" scope, and because rule requires us to state plainly: neither lawsuit concerns this building, its construction, its financing, or its buyers. If these entities are in fact behind ORA, that connection is not confirmed anywhere in what we were given — which is itself a gap you should ask your broker to close in writing.

On track record proper — number of prior deliveries, average delay against promised completion dates, defect litigation, lender defaults — nothing is published. The score reflects that near-total absence, not a finding of poor performance.

04The money

Florida law escrows only the first 10% of a preconstruction deposit by statute. Everything collected above that threshold — and here, the schedule calls for 40% before delivery (20% at contract, 10% at groundbreaking, 10% at top-off) — sits outside that statutory protection unless the developer has voluntarily agreed to escrow more, which is not stated in this evidence. Combined with 100% of the purchase price due before completion, this is the reason the deposit protection score sits at 2 out of the scale used.

Association dues (HOA) are not published; the carrying-cost score was set at the category midpoint specifically because of that gap, not because dues are known to be moderate. Insurance costs — an increasingly material line item for new Miami high-rises — are also unpublished.

On the positive side of the ledger: as new construction, ORA is not subject to Florida's SB-4D milestone structural inspection requirement within the next ten years, which is a real cost avoided relative to older buildings in the same market.

05The location and the view

The address is 1210 Brickell Avenue, in Brickell — Miami's dense financial-district corridor. Beyond the address itself, the evidence supplies no transit walk-time figure, no FEMA flood zone designation, and no data on protected view corridors.

No information on adjacent or planned towers was supplied — the nearby-development field is empty. In a corridor as active as Brickell, that is a meaningful blank: what gets approved on the neighboring parcel in the next five years can matter as much as what you buy today, and we simply do not have that picture here.

The location score of 6 reflects a reasonably regarded corridor address with almost no supporting detail behind it — treat it as a placeholder score built on an incomplete file, not a confident read on durability.

06What would worry me

The dominant risk here is disclosure, not any single red flag. No price, no per-square-foot figure, no HOA, no escrow percentage above the statutory floor, no rental policy, no sales percentage, and no confirmed developer name — that is six or seven separate gaps in the file for a $2 million-class purchase decision, and each one compounds the others.

The deposit structure itself is a specific, quantifiable concern: 40% of the price is due before groundbreaking is even complete, with only the first 10% guaranteed by Florida statute to sit in escrow. If the project stalls after top-off, a buyer's exposure is considerably larger than the statutory minimum implies.

The litigation entries in the evidence, again, concern other properties — Jade Ocean and M Resort Residences — not ORA, and one produced a denial from the named party with no stated final resolution. We include them only because the evidence tags them under "developer" scope and because you should know they exist if the developer connection is confirmed elsewhere. They should not be read as a judgment on this building.

Finally: the construction loan on record is described as pre-development financing, not construction financing outright. Until a construction loan proper is disclosed, delivery risk should be read as elevated relative to a project with vertical financing already in place.

Fits an investor who

  • Buyers with a long horizon who can hold through a 2030 delivery without needing interim liquidity
  • Buyers able to underwrite a purchase without published pricing, pending direct developer disclosure
  • Buyers with high tolerance for preconstruction and financing-stage risk

Does not fit if you

  • Buyers who need rental income certainty — no rental or short-term-rental policy is published
  • Buyers requiring deposits protected beyond Florida's statutory 10% escrow minimum
  • Buyers on a short hold period who need resale liquidity data that is not yet available

What would change this score

  1. Publication of a confirmed price list or price-per-square-foot figure
  2. Disclosure of the deposit escrow percentage, particularly for amounts above the statutory 10%
  3. Confirmation of the actual developer entity and its delivery track record
  4. Conversion of the pre-development loan into a disclosed construction loan ahead of groundbreaking
  5. Release of HOA dues and an insurance cost estimate

Written from the verified ledger above. Where a figure is not published, this report says so rather than estimating. How this works

Exhibit A The facts17 sourced
Status
Pre-construction
Verified Press
Completion
2030
Verified Developer
Residences
540
Verified Developer
Price from
Not published
Price to
Not published
Per sq ft
Not published
Residence size
487–2,302 sq ft
Verified News
Sold
Not published
HOA
Not published
Deposit escrow
Not published
Florida escrows only the first 10% by statute.
Rental policy
Not published
Construction loan
$36M · Amerant Bank — the cited source identifies its financing as a $36,080,000 pre-development loan, not expressly as a construction loan
Verified Press
Architect
Arquitectonica
Verified Developer
Interiors
m2atelier
Verified Developer
Exhibit B How it scoresrubric v1

Each category is a formula over verified fields — the method is published. The wording explains the number; it does not choose it.

Delivery risk

4.5

3 verified · 2 missing

  • Construction stage: preconstruction.
  • Construction financing is recorded.

Developer track record

7.5

4 verified · 1 missing

  • 4 project(s) delivered.
  • Operating since 1983.

Price vs comparables

5.0

2 verified · 1 missing

  • Not enough price data to position against the neighborhood band.

Carrying cost

6.0

1 verified · 2 missing

  • HOA not published; scored at the category midpoint.
  • New construction — no SB-4D milestone inspection due within ten years.

Deposit protection

2.0

1 verified · 1 missing

  • Escrow terms not published. Florida escrows only the first 10% by statute.
  • 100% of the purchase price is due before completion.

Location and view durability

No score

0 verified · 4 missing

  • Not enough verified inputs to score this category. This is a gap in our research, not a finding about the project.

Liquidity

No score

0 verified · 3 missing

  • Not enough verified inputs to score this category. This is a gap in our research, not a finding about the project.
Exhibit HWhen your money is at risk40% before completion
  1. 20%ContractAt contract signing
  2. 10%GroundbreakingAt groundbreaking
  3. 10%Top-offAt top-off
  4. 60%DeliveryUpon delivery; the published schedule describes this as the remaining balance

Florida escrows only the first 10% of a deposit by statute. Escrow terms above that are not published for this project, so the remainder may be spent on construction and is only as protected as the developer's balance sheet.

Exhibit CAmenities34 listed · 34 sourced

Pool and wellness

  • Expansive yet intimate resort-style pool with a sun shelf, cabanas, lounge chairs, vibrant tropical landscaping, poolside food and beverage, and towel service.
  • Vento rooftop pool, described as a signature element of the Vento experience.
  • Vento’s adjacent private pool and members lounge, creating a rooftop retreat.
  • Relaxation lounges and a wellness terrace.
  • Individual treatment rooms and a couples’ treatment room.
  • Steam rooms, sauna, hammam, and men’s and women’s locker rooms with showers.
  • Styling room with lighted vanities, juice and nutrition bar, and stairs connecting directly to the Fitness Center.

Fitness

  • Fitness & Wellness Center designed for socializing, recentering, and reconnecting.
  • Virtual sports room with simulators.

Dining and social

  • Fuoco: an open-fire restaurant and bar featuring global ingredients, wood-burning-fire cuisine, crudos and raw options, and chefs from around the world.
  • Vento: a two-story indoor-and-outdoor rooftop experience with panoramic views.
  • Vento sky lounge and bar.
  • Vento show kitchen.
  • Vento private dining room and event space.
  • Vento entertainment stage for live performances.
  • Vento intimate lounge and fire pit.
  • Private members-only lounge, Vento by Casa Tua.
  • The Clubroom: bar and lounge, prep kitchen, chef’s kitchen, indoor and outdoor seating, oversized LED screen, and game tables/area.
  • The Social Lounge: owners’ lounge, indoor and outdoor seating, oversized LED screen, and reading library.
  • Bosco relaxed bar and lounge suitable for indoor/outdoor private gatherings.
  • Bosco open event space for live music, movies, sporting events, and performing arts.

Services

  • Dedicated on-site professional operator to ensure smooth arrival and departure for residents and guests.
  • On-site concierge addressing residents’ and guests’ needs.
  • Integrated digital concierge with residential booking management, housekeeping-service scheduling, and guest communication.
  • Direct delivery to residents’ doors from Fuoco.
  • Direct dine-in delivery to residents’ doors from Vento.

Outdoor and family

  • Wrap-around terraces providing captivating city and bay views.
  • Landscaped walking paths with secluded spaces for reflection and exploration.
  • Gathering lawn for film screenings, live music, games, and performances.
  • Wellness pavilion for group yoga, tai chi, pilates, and meditation.
  • Serene water features.
  • Shared, open workspaces, private offices, and content-creation rooms.
  • Open event space for live music, movies, sporting events, and performing arts, with views.

Parking and access

  • Two separate lobbies: a residents’ lobby and a short-term check-in/check-out lobby.
Exhibit DLocation1210 Brickell Avenue, Miami, FL

© OpenStreetMap · CARTO

Exhibit DWhat is going up around itNone blocking · 6 partial
NESW1040 South Miami Avenue tower — 80 floors — NW1414 Brickell — 81 floors — SW888 Brickell Dolce & Gabbana — 90 floors — NECipriani Residences Miami — 85 floors — SWCitadel Global Headquarters — 54 floors — EThe Residences at 1428 Brickell — 70 floors — SW

ORA by Casa TuaBlocksPartialNo impact

Height of each mark reflects storeys. Distance from centre reflects proximity.

  • 1040 South Miami Avenue towerPartial

    80 floors · NW · proposed; pre-application (945 ft) · source

  • 1414 BrickellPartial

    81 floors · SW · proposed; Miami-Dade review (approximately 1,010 ft) · source

  • 888 Brickell Dolce & GabbanaPartial

    90 floors · NE · under construction; 1,049 ft · source

  • Cipriani Residences MiamiPartial

    85 floors · SW · under construction; vertical construction complete (950 ft) · Summer 2027 · source

  • Citadel Global HeadquartersPartial

    54 floors · E · approved (height not stated in the cited record) · source

  • The Residences at 1428 BrickellPartial

    70 floors · SW · under construction (height not stated in the cited record) · 2028 · source

Exhibit E What people say 9 quoted

Verbatim, as published. We quote; we do not paraphrase, score or summarise sentiment.

As of now, a general contractor has not been announced, and vertical construction has yet to begin.
journalist Florida YIMBY Jul 2025 source
The acquisition of the site and loan closing are principal steps that mark an exciting beginning for ORA by Casa Tua's vision to take shape,
developer Florida YIMBY Jul 2024 source
We are eager for Miami’s community to sense the anticipation and witness the project come to life.
developer Florida YIMBY Jul 2024 source
a true vertical community where people rediscover their relationship with themselves, with others and the natural world,
developer Miami Luxury Homes Mar 2023 source
A tranquil, 40-foot sky park at the heart of ORA and soaring 500 feet—with nature in every corner.
developer ORA by Casa Tua official website source
At ORA, life happens now—and it flourishes in masterful architecture, impeccably designed residences, thoughtfully curated experiences delivered with heartfelt hospitality, and spaces intentionally crafted to inspire, awaken, and stir the soul.
developer ORA by Casa Tua official website source
The residences at ORA offer life beyond walls—they are doorways to freedom, crafted for lives that embrace the now and treasure the timeless.
developer ORA by Casa Tua official website source
Wrap-around terraces provide captivating city and bay views
developer ORA by Casa Tua official website source
Dedicated on-site professional operator to ensure smooth arrival and departure for residents and guests
developer ORA by Casa Tua offering brochure source
Exhibit F Legal and financial
Sources 17 15 verified

Every published figure on this page, with where it came from and when it was retrieved. Figures we could not confirm from a first-party or public source are marked unconfirmed and are excluded from the score.

Field Value Source Retrieved Confidence
architect "Arquitectonica" fortuneintlgroup.com Developer Aug 30, 2026 Verified
completion estimate "2030" fortuneintlgroup.com Developer Aug 30, 2026 Verified
construction lender "Amerant Bank — the cited source identifies its financing as a $36,080,000 pre-development loan, not expressly as a construction loan" floridayimby.com Press Aug 30, 2026 Verified
construction loan usd 36080000 floridayimby.com Press Aug 30, 2026 Verified
deposit schedule [{"stage":"Contract","pct":20,"when":"At contract signing"},{"stage":"Groundbreaking","pct":10,"when":"At groundbreaking"},{"stage":"Top-off","pct":10,"when":"At top-off"},{"stage":"Delivery","pct":60,"when":"Upon delivery; the published schedule describes this as the remaining balance"}] oracasatuamiami.com Developer Aug 30, 2026 Verified
developer "1210 Brickell Owner LLC" oracasatuamiami.com Developer Aug 30, 2026 Verified
escrow note "The published purchase-process description states that the first deposit, typically 10–20% of the purchase price, is wired to the developer’s escrow account at a Florida-licensed institution, and that subsequent deposits are released at construction milestones. No cited project-specific document establishes escrow protection beyond Florida’s statutory first 10% or identifies surety bonding." newdevelopmentestates.com News Aug 30, 2026 Verified
floors 77 orabycasatua.com Developer Aug 30, 2026 Verified
interior designer "m2atelier" fortuneintlgroup.com Developer Aug 30, 2026 Verified
official name "ORA by Casa Tua" orabycasatua.com Developer Aug 30, 2026 Verified
rental policy "The cited condominium documents do not provide an identified rental restriction. Published project materials state a three-day minimum rental period and describe nightly/weekly, seasonal three-month, and yearly rental terms; the official project website states that the condominium offering documents, rather than website statements, control." oracasatuamiami.com Developer Aug 30, 2026 Unconfirmed
status "preconstruction" floridayimby.com Press Aug 30, 2026 Verified
street address "1210 Brickell Avenue, Miami, FL" miamiluxuryhomes.com Aggregator Aug 30, 2026 Unconfirmed
summary "ORA by Casa Tua is identified as being developed by 1210 Brickell Owner LLC, with Fortune International Group identified as the developer and Amerant Bank identified as the provider of initial financing. A published schedule states 20% at contract, 10% at groundbreaking, 10% at top-off, and the remaining 60% at delivery. The available purchase-process material describes escrow for the initial deposit and milestone releases for later deposits, but does not establish project-specific bonding or escrow beyond the statutory first 10%. The only identified financing is a $36,080,000 pre-development loan, not financing expressly identified in the cited source as a construction loan; reported developer-related litigation concerns other Fortune projects." oracasatuamiami.com Developer Aug 30, 2026 Verified
total units 540 orabycasatua.com Developer Aug 30, 2026 Verified
unit sqft from 487 fir.com News Aug 30, 2026 Verified
unit sqft to 2302 fir.com News Aug 30, 2026 Verified